Compare blow-moulding and filling as a connected process. Use the actual preform, bottle drawing and filling requirement to prepare a technical shortlist.
- Which preforms, moulds and bottle formats are supported?
- What air, power and cooling requirements need confirmation?
Plan utilities for a PET project
Separate the documented requirements of the blower, filler and supporting equipment. Obtain the site connection points and transport dimensions. Review compressed-air and cooling capacity with the project specialists; the equipment listing alone cannot size the destination utilities.
Plan before dismantling
Document layout, cable and pipe routes, reference points, software backups, alignment and the sequence needed for reassembly.
Protect every component
Define cleaning, preservation, labelling, packing, lifting points, transport frames and environmental protection for the journey.
Prepare the destination
Confirm utilities, foundations, access, safety compliance, integration, commissioning resources and acceptance criteria.